The work speaks in one-line diagrams.
Case studies published from our internal project system as work completes — filter by discipline.
500kV500kV Nuclear Substation Full Relay Upgrade
Complete protection and control relay upgrade for an entire 500kV nuclear substation — five 500kV lines, two 500/230/12kV transformers, two capacitor banks and twenty MODs, with all-new microprocessor relays across 27 new panels.
Read the case study →
100kVSolar & Wind Interconnection — 100kV Substation Expansion
Renewables-driven expansion of a 100kV substation: full protection and control relay upgrade for the site, a new control house, and six and a half new relay panels designed by Amped I.
Read the case study →
138kVIntelligent Substation Upgrades — IEC 61850
P&C design and engineering for four IEC 61850-compliant intelligent substations — all-new relaying with redundant fiber, new batteries, auto-throw-over, and DNP integration with fire protection. Schemes include time-programmed tripping, load shedding and auto bus-tie closing.
Read the case study →
12–34kVDistribution PMU Installation Program
Program-scale Phasor Measurement Unit rollout across 30+ distribution substations: PDC cabinets, satellite timing, ethernet switching and relay upgrades — grid frequency visibility at the distribution edge.
Read the case study →