The project
Program-scale Phasor Measurement Unit rollout across 30+ distribution substations: PDC cabinets, satellite timing, ethernet switching and relay upgrades — grid frequency visibility at the distribution edge.
Scope of work
- Designs for 30+ substations to date, 12kV and 34kV distribution
- PDC cabinet installation with satellite and antenna per site standards
- Breaker failure and transformer relay protection upgrades
- IP-based communications over fiber and copper infrastructure
- Conduit and tray design for cable installation
- Material requests and procurement support per project
- Schematics for IFA, comments incorporated, wiring package for IFC