Case Study
Solar & Wind Interconnection — 100kV Substation Expansion
The project
Renewables-driven expansion of a 100kV substation: full protection and control relay upgrade for the site, a new control house, and six and a half new relay panels designed by Amped I.
Scope of work
- Three 100kV lines in breaker-and-a-half configuration
- One 69kV line, one 100/69kV auto transformer, one 100/12.5kV transformer
- Six new 12.5kV feeders and two 100kV buses
- New control house layout with 6.5 new relay panels
- Power wiring diagrams, AC/DC panelboard, supervisory schematics
- New and revised remote wiring diagrams for breakers
- Schematics for IFA, comments incorporated, wiring package for IFC