138kV LINE UPGRADE TO SEL RELAYING

Amped I has begun the design of a 138kV line upgrade in Indiana. This line upgrade will improve the electrical grid’s reliability by upgrading outdated, pre-existing protection and control relays with Schweitzer Microprocessor relays and automation controllers. One of the challenges faced in this design was obtaining the technical clarification of design details that match supplied templates to existing schemes. Amped I expects to complete this design in the summer of 2017.

LOCATION

CHICAGO OFFICE 1801 W Warner Ave,
#301 Chicago, IL 60613

LET'S TALK PROTECTION & CONTROL

  Brian Rabbitt Email Me

  Call Me 312.420.7636

© 2020 AMPED I LLC. All Rights Reserved.