Amped I is currently performing fault analysis and modelling using Aspen oneliner and Cymdist to help determine recloser settings and coordination on a distribution circuit.  We will then be using acSelerator software from SEL to load these settings into the database for the utility showing feeder, device, fault, and curve edits.  Reclosing shots, stuck breaker timers, and downstream protective devices will all be considered.  We are then verifying coordination between other bus feeders on the system.