Amped I has just completed turnover of a replacement of a 300 MVA transformer in the downtown of a major metropolitan city. This design included new power system transformer protection and bus protection. It also included integration of serial communication for transformer monitoring as well as microprocessor relay SCADA. One of the challenges that went beyond a typical project was the coordination with another engineering firm that designed the physical and structural. This was a successful coordination.

Topics: “BROWNFIELD” Upgrades

Bringing innovation, quality and confidence to power and fire protection infrastructure.

AMPED I provides exceptional design and engineering services for the power transmission and distribution industry.